Tier-1 B2B Engineering & VDC Production Partner

Precision MEP & Fire Protection BIM Delivery for EU, UK & US Contractors

Gravix Engineering & BIM Solutions operates as an extension of your internal VDC and design engineering teams—delivering LOD 300–400 Revit MEP modeling, NFPA 13/14 & EN fire protection, Navisworks clash resolution, and fabrication-ready shop drawings under strict client BEPs.

Authoring Depth
LOD 300–400
Fabrication & Spool Ready
CDE Governance
ISO 19650
BEP & ACC / BIM 360 Aligned
Verification
2-Stage QA/QC
Coordinator Sign-Off Gate
Live Sync
CET/GMT & EST
4-Hr Daily Working Overlap
GRAVIX_VDC_SPEC_V2.4.NWD
ZERO CRITICAL CLASHES
EL +4.250m STRUCTURAL SOFFIT ZONE A: HVAC SUPPLY & CHW HEADERS (LOD 400) ZONE B: NFPA 13 SPRINKLER MAIN & BRANCHES AHU-01 SUPPLY DUCT 1200x600 OFFSET +220mm DN100 SCH-40 SPRINKLER RING MAIN
Authoring Suite: Revit 2022–2026 • Navisworks • AutoCAD MEP
Fire Standards: NFPA 13 / 14 / 20 • BS EN 12845
Exchange Formats: .RVT • .NWD/.NWF • .DWG • IFC 2x3/4 • COBie
B2B Compliance: Zero-Rated Export (GST LUT) • Direct B2B
01 // Production Capabilities

Core Engineering & BIM Services

Defined, milestone-driven BIM production packages engineered for M&E contractors, data-centre builders, and multidisciplinary consultancies.

LOD 300–400

HVAC & Mechanical Modeling

Parametric Revit modeling of supply, return, exhaust, and smoke-extract ductwork, chilled/heating water headers, AHUs, chillers, pumps, and VAV units with verified coil-pull clearances.

Deliverables: .RVT, Schedules, Sections MEP-01
NFPA 13/14 & EN

NFPA 13/14 & EN Fire Protection

Wet, dry, pre-action, and deluge sprinkler networks, fire pump rooms, standpipes, and seismic bracing modeled strictly to NFPA 13/14 and BS EN 12845 deflector obstruction rules.

Deliverables: Riser Schematics, BOMs FP-02
Navisworks Manage

Multidisciplinary Navisworks Clash Coordination

Federated model aggregation across MEP, Structural, and Architectural links. Grouped hard-clash and clearance matrices with engineering re-routing to achieve zero critical conflicts.

Deliverables: .NWD, BCF Logs, HTML/PDF VDC-03
LOD 400 Spools

Fabrication & Spool Shop Drawings

Constructible installation layouts, enlarged plant-room sections (1:20 / 1:25), pipe/duct spool sheets, hanger/trapeze schedules, and dimensioned builder's work penetration drawings.

Deliverables: Client Titleblock PDF/DWG FAB-04
ReCap .RCP/.RCS

Scan-to-BIM & Point Cloud Conversion

High-accuracy conversion of registered laser-scan point clouds (.RCP/.RCS) into parametric Revit MEP as-built models for plant retrofits, cleanrooms, and facility digital twins.

Deliverables: As-Built .RVT, IFC 4 SCN-05
2D DWG → 3D BIM

2D CAD-to-BIM Migration

Intelligent migration of 2D AutoCAD layouts and tender schematics into data-rich Revit MEP models complete with system classifications, slope gradients, and COBie asset parameters.

Deliverables: Parametric .RVT, COBie CAD-06
02 // Enterprise Quality & Security

Technical Governance, ISO 19650 Workflow & Two-Stage QA/QC

Built for Tier-1 procurement compliance. Every model package is authored inside your exact Revit templates, governed by ISO 19650-1/2 information workflows, and verified through a mandatory two-gate audit before CDE upload.

Gate 01 // Modeler Self-Check Discipline BIM Modeler

Parametric & BEP Template Verification

  • ✓ Shared Coordinates & Datums: Verified alignment with project base point, survey point, and pinned structural grids.
  • ✓ System Logic & Slopes: Continuous flow connectivity, sanitary/condensate slope validation (1:50 / 1:80), and family parameter population.
  • ✓ Model Hygiene: Unused family purge, Revit warning log reduction (<5 non-critical warnings), and strict ISO 19650 container naming.
Gate 02 // Coordinator Audit Principal BIM Coordinator

Navisworks Clash & Constructability Sign-Off

  • ✓ Zero Critical Clashes: Full Navisworks hard-clash and maintenance clearance audit against Structural and Architectural links prior to release.
  • ✓ Code & Access Compliance: NFPA 13/14 sprinkler deflector clearances, valve accessibility, and AHU coil-pull zone checks.
  • ✓ CDE & OpenBIM Release: Validated .rvt, .nwd, .ifc, and bookmarked .pdf transmittal with signed QA/QC checklist attached.
01 / ISO 19650-1 & 2

CDE Status Discipline

Strict adherence to WIP, Shared, and Published container states inside Autodesk Construction Cloud (ACC / BIM 360), Procore, Dalux, and Viewpoint.

02 / NAMING & BEP

Exact Client Standards

We adopt your project's exact Revit template, titleblocks, shared parameters, view filters, and BS 1192 / ISO 19650 file naming codes from Day 1.

03 / DATA SECURITY

MFA & File Isolation

Role-restricted project directories, enforced MFA on Google Workspace (gravixbim.com) & client CDEs, zero removable media, and formal NDA purging.

04 / IP OWNERSHIP

100% Client IP Vesting

All authored Revit models, custom families, clash logs, and shop drawings vest exclusively with the contracting client upon milestone settlement.

03 // Proven Coordination Benchmarks

Navisworks Clash Resolution Case Studies

Representative anonymised coordination benchmarks from high-density institutional and defense facilities (including MCLB Albany ARC Training Facility scopes).

CASE STUDY 01 // LOD 400 Revit MEP + Navisworks Manage

High-Density Mechanical Plant Room Coordination

Facility & Engineering Scope

Institutional Training & Operations Facility — Central Chilled Water & Heating Plant Room (LOD 350–400 Revit MEP modeling, valve train detailing, and equipment maintenance clearance envelopes).

Initial Navisworks Clash Audit

42 hard and clearance clashes detected between DN200 chilled-water supply headers, structural steel bracing gussets, AHU coil-pull zones, and high-level electrical cable ladders.

Engineering Routing Resolution

Re-elevated primary chilled-water headers by +220 mm using custom trapeze hanger assemblies, re-sequenced butterfly and balancing valve orientations for floor-level operator access, and shifted electrical trays to the perimeter bay.

Verified Coordination Telemetry
Initial Clashes
42
Hard + Clearance
Post-Audit Clashes
0
100% Critical Closure
Turnaround Cycle: 6 Working Days
Primary Deliverable: 1:25 Spool & Plant Sheets
Field RFI Impact: Zero Header Rework on Site
04 // Zero-Friction Onboarding

Low-Risk 5–7 Day Fixed-Price Pilot Engagement

Evaluate our Revit modeling speed, BEP compliance, and Navisworks clash resolution quality on a bounded project zone before committing to a framework agreement or dedicated overflow pod.

Standard Pilot Scope 5–7 Business Days
  • ■ Bounded Target Zone: 1 mechanical plant room, 1 riser core, or 1 building floor/zone (LOD 300–400).
  • ■ Full Deliverable Set: Native .rvt model, federated .nwd clash report, and coordinated PDF/DWG sheets on your titleblock.
  • ■ Transparent B2B Invoicing: Direct company-to-company contract in USD, EUR, or GBP with zero-rated export invoicing (GST LUT).
30 / 40 / 30 Milestone Transparency
30%
Mobilization
BEP & Template Setup
40%
WIP Review
Clash Matrix & Routing
30%
Final Handover
QA-Signed RVT/PDF
Interactive Scope Calculator

Pilot Scope Estimator & Quote Request

Configure your pilot package below to preview indicative fixed-fee bands and generate a structured scope summary for our BIM Delivery & Partnerships desks.

Indicative Fixed-Price Pilot Band
$980 USD (Est. 5–6 Working Days)
30% Start: $294 • 40% WIP: $392 • 30% Final: $294